Back to AV Tools

Capital Room Intake Gate

A capital request for a conference room usually reaches IT after the stack is already chosen. This brief is the six questions to attach before the PO, so the room is supportable once the truck leaves.

Why this exists

Capital buys rooms on a cycle that does not wait for IT. The integrator fills the hole with last year's leftover stack or their default kit. Helpdesk meets that room for the first time when an executive cannot start the call. This gate is the page you clip to the request so support is specified before anyone orders hardware.

The six gates, in short

#GatePlain meaning
1Platform you already runSpec against the platform you run — not leftover kit
2Network path, identity, monitoringWritten before the codec is ordered
3Named owner after go-liveWeekday and after 5
4First-touch scriptNight shift can follow without sitting in the room
5Remote reachabilityIf the building will be empty
6Exceptions named + datedSilence is not an exception

What is in the PDF

Page 1 is the form to clip to the capital packet: six gates, write-in lines, initials. The pages after that are why each gate fails and what to refuse.

Frequently Asked Questions

When should IT attach this gate?

Attach it before the PO, while the capital packet is still open to change.

What if the PO is already live and three gates fail?

Bring that packet on a twenty-minute call. We mark the three things to refuse.

Does this replace an integrator submittal?

No. This is the owner-side gate IT attaches so the submittal has to answer supportability before money moves.

Do you sell the hardware on the form?

No. We do not sell hardware and we do not install.

Bring us the room.

If a room on a live PO already fails three of these gates, bring that packet. We will mark the three things you should refuse.

Book a 20-min call